VIDEO. From the San Mateo County Public Works meeting with the Higgins Canyon Community after the 2023 storms. The meeting was held on Thursday, April 13th, 2023 at 6:00pm, by Zoom.
2023 Slip-Out Repair Project Higgins Canyon Road 4/13/2023
[pdf-embedder url=”https://www.coastsidebuzz.com/wp-content/uploads/2023/04/2023-04-13-Higgins-Canyon-Rd-Slip-out-Repair_final.pdf” title=”2023-04-13 Higgins Canyon Rd Slip-out Repair_final”]
2023 Slip-Out Repairs Near 2180 Higgins Canyon Road
Project No. TBD; Project File No. E5083
Location
Near 2180 Higgins Canyon Road, Half Moon Bay, CA 94019
About the Project
The slip-out repair project will repair the failing embankments and damaged pavements near 2180 Higgins Canyon Road. The work to be done consists, in general, of installing geocomposite earthwork, soldier piles and lagging retaining wall, tiebacks, drainage improvements, and installing a rock slope protection revetment with plantings, and erosion control/slope protection.
Public Works Contact
Wency Ng
Senior Engineer
[email protected]
650-363-4100
Contractor
TBD
UPDATES
- February 2023 – Subsurface geotechnical investigation completed. Consultant has performed laboratory test for subsurface soils from corings at 3 different locations on site. Additional landslide and damages to the road were observed, which led to full closure of the road.
- March 2023 – The road is currently closed due to unsafe conditions. The design consultant has prepared a draft geotechnical report for the repair recommendations. Design for the repair is anticipated to begin in April 2023.
- April 2023 – Public Zoom Meeting held on Thursday, April 13, 2023, at 6:00 PM – 7:00 PM. Please click Herefor the recorded Public Zoom Meeting on April 13, 2023