STAFF REPORT. From San Mateo County Harbor District Commissioners meeting on April 19th, 2023 at 1:00pm, as a hybrid meeting.
PPH Johnson Pier Reconfiguration, DEFGH Dock and Fuel Dock Replacement Project: Initiated Jan. 2017, added DEFG Docks 10/20/21
- H-Dock replacement meeting to gain input from public/tenants/stakeholders was held January 23, 2018 at the HMBYC.
- Public input was addressed in a new drawing and sent with an additional questionnaire to all H-Dock tenants on March 21, 2018.
- Addressed input gathered at first meeting and from questionnaire for H-Dock replacement. The second public meeting was held on May 15, 2018 at the HMBYC.
- Terminus reconfiguration preliminary stakeholder/public meetings held on May 29, 2018 and July 17, 2018 to gather input/ideas on needed alterations.
- Design/engineering consultant M&N provided a project update at the March 20, 2019 Board meeting, along with proposal to combine Johnson Pier Terminus Reconfiguration so that programmatic permitting can be made most cost efficient.
- Consultant M&N provided Project update presentation at 12/18/19 Board meeting.
- Consultant M&N worked on condition survey of potentially damaged pier support pilings and crossmembers which were identified in a cursory inspection as a part of the Master Plan. M&N Team conducted boring tests to determine structural integrity on 10/7/21, reports indicated that there is no damage due to overstressing, it was simply spalling caused by corrosion of rebar close to the surface.
- 11/1/21 M&N submitted final report on observed damage to pilings and crossmembers and suggested actions for repair. M&N will continue working with Calif Grant Consulting in identifying and applying for grant funding opportunities.
- On 10/20/21 Board approved adding Design & Engineering for replacement of docks DEFG. M&N prepared a Change Order to reflect the additional D&E efforts, which was approved 1/19/22. M&N will continue working on design/engineering and is working to schedule a Bathymetric survey of the inner harbor so the need for an associated dredge episode can be evaluated.
- 2/4/22 M&N submitted 30% plan drawings, GM and DOO met with M&N to review.
- 5/25/22 Board considered a Change Order for M&N to add design/engineering of electrical upgrades and to repair the crossmember spalling that was identified in the GHD condition survey.
- 90% Pier Expansion/Dock Replacement plans complete, final permitting underway. 80% of plans complete for electrical upgrades and repair crossmember spalling, permitting underway.
More on the Johnson Pier Renovation on Coastside Buzz
San Mateo County Harbor District Board Meetings ~ 3rd Wednesday @ 1:00pm
Watch remotely. Comments and questions by email.
Harbor District Calendar
Harbor District Agendas and Remote Meeting Links
Harbor District Pacifica Coast TV Videos
2023 Board of Harbor Commissioners Contact Information:
Please note that email correspondence sent to or from Members of the Harbor Commission via the District’s website are considered public records and may be subject to disclosure and additional distribution pursuant to the Public Records Act and the Brown Act.
To email the entire Harbor Commission, click here.
William Zemke
Position: President
Term: 2021 -2025
mail: [email protected]
Phone: (650) 730-9239
Tom Mattusch
Email: [email protected]
Phone: (650) 619-0459
Virginia Chang Kiraly
Email: [email protected]
Phone: (650) 730-3911